A boat move February 28, 2019 We've moved Sanguine into the joinery workshop to continue with the fitout. Read more
Lining out February 28, 2019 Dave has started lining out the interior, the ceiling panels are going on first. Read more
Engine February 28, 2019 The engine has been placed inside the engine compartment and Zak has started installation. Read more
Subfloor February 08, 2019 We've laid the subfloor, with insulation sheeting underneath. The aft section steps up approx 4" to give a shorter travel on the steps down into the boat. Read more
Ballast February 08, 2019 The boat is now ballasted with almost 2000 concrete commons blocks. Read more
Skin fittings February 06, 2019 We've marked the boat out for skin fittings and other cutting. Read more
Windows and portholes February 06, 2019 Tom and Dave have done a dry fit of the windows and portholes Read more
Exterior fittings February 06, 2019 Zak has made a start on fitting vents and roof lights and preparing the exterior for priming. Read more
Battening February 06, 2019 The battening is done and we are ready to prepare the interior walls for sprayfoaming. Read more
A new home February 04, 2019 We're very pleased to received Sanguine into our paintshop today. Read more